Back to Assign Pro guides

Assign Pro guide

Static group change logs

When a batch assignment is finished, leave enough evidence for the next person to trust what happened.

What this helps with

A record of the target group, matched devices, unmatched rows, and whether the action added or removed Macs.

Follow these steps.

  1. Confirm the target static group before running the assignment.
  2. Check whether the action is add or remove.
  3. Save or review the result summary after the operation completes.
  4. Keep sensitive values out of shared notes.
  5. Use the log to answer what changed without rerunning the job.

Checks before you move on

  • Target group confirmed
  • Add/remove action clear
  • Result summary reviewed
  • Sensitive values redacted

Related guides